Tags Archives
You are currently viewing all posts tagged with 386 Pacific.
High Park Reno – Modifying standard practices to reduce thermal bridging
The High Park renovation is fully underway, and we had pushed the contractor to modify some of his standard practices to reduce thermal bridging. The original house had no insulation and was built with hollow clay bricks. We are adding a stud wall to allocate Closed Cell Spray Foam insulation (ccSPF) by offsetting it from […]
Read morePassive Survivability – Building Design for Resilience and Safety
Passive Survivability is a term coined by Building Science expert Alex Wilson, which he defines as “maintaining livable conditions in the event of extended loss of power or interruptions in heating fuel.” Alex, came up with the idea after Hurricane Katrina in New Orleans, observing how modern un-powered, un-serviced buildings overheated while traditional architecture remained […]
Read moreNight Visions – Contact Photography Festival 2017
UPDATE: blogTO has featured “Night Vision” as one of the 20 must-see exhibits of the Contact Photo Festival — check out the full list here: http://www.blogto.com/arts/2017/04/contact-photography-festival-toronto-2017/ Coolearth Architecture is pleased to once again take part in the annual Scotiabank Contact Photography Festival, which runs throughout the month of May. This year we are featuring the photography […]
Read moreCoolearth – Sustainable Architecture at the Green Living Show
This past weekend the Coolearth team was at the Green Living Show. Thank you to everyone who came out to the show — there was a lot of very interesting conversation! After Sheena’s seminar on how homeowners can retrofit their houses to be Net-zero Carbon there were so many people around the booth — we apologize […]
Read moreBlower Door Testing on Net-zero Toronto Semi-detached Retrofit
Yesterday the Coolearth team conducted a Blower Door test on the Net-zero Toronto Semi-detached Retrofit project during the construction phase to identify any major air leaks. By doing the Blower Door test mid-construction we are able to work with the contractor to solve problems before we get to far into the process. This saves money […]
Read more